Free downloadable templates.
Production-ready templates for QA, FAI, PPAP, GD&T, MSA, and inspection. Pre-formatted with formulas. Indian OEM variants planned.
Templates coming soon
We're building a complete set of free, production-ready templates — AS9102 Forms 1/2/3, PPAP submission packs for Tata/Mahindra/Bajaj, GD&T quick reference, FMEA, control plans, and gauge R&R worksheets. Below is the roadmap of what's being built. Bookmark this page or check back weekly.
FAI & Aerospace
AS9102 Form 1, 2, 3 (Rev C)
Latest 2023 format. Pre-filled formulas for characteristic accountability and pass/fail logic.
In progressAS9102 Worked Example
A complete AS9102 submission for a real machined bracket — with explanations for every cell.
In progressNADCAP Self-Audit Checklist
175 checkpoints, organised by AC7102 special process. Pre-fillable for HT, NDT, surface treatment.
In progressBoeing FAI Checklist
Boeing-specific FAI requirements pulled from BPS-2110 — what to add beyond AS9102.
In progressPPAP & Automotive
PPAP Submission Pack — Tata Motors
Tata-specific 18-element PPAP pack with the variations Tata Tier-1s expect.
In progressPPAP Submission Pack — Mahindra
Mahindra-specific PPAP variations with their part submission warrant template.
In progressAIAG Standard PPAP — Level 3
The full 18-element AIAG PPAP at submission Level 3, with annotated examples.
In progressBajaj 4-Wheeler PPAP Pack
Bajaj's specific PPAP requirements for 4-wheeler suppliers — with checkpoint list.
In progressGD&T & Tolerancing
GD&T Symbol Quick Card
One-page reference for all 14 ASME Y14.5 symbols, datums, and modifiers.
In progressTolerance Stack-Up Worksheet
Worst-case + RSS analysis with up to 20 dimensions. Auto-pivot for direction changes.
In progressPosition Tolerance Bonus Calculator
MMC/LMC bonus tolerance worksheet with feature-of-size deviation tracking.
In progressMSA & SPC
Gauge R&R Worksheet
3-operator, 10-part, 3-trial GR&R study with auto-calculated %study variation.
In progressCp / Cpk / Pp / Ppk Worksheet
Process capability with histogram, normality test, and out-of-control flagging.
In progressX-bar & R Control Chart
SPC control chart with auto-calculated control limits and Western Electric rule alerts.
In progressFMEA & Risk
Process FMEA Template (AIAG-VDA)
Latest AIAG-VDA harmonised PFMEA format with action priority calculator.
In progressDesign FMEA Template
DFMEA aligned with AIAG-VDA. Severity / Occurrence / Detection lookups built in.
In progressControl Plan Template
Linked-to-PFMEA control plan. Pre-launch + production phases. Reaction plan column included.
In progress